| start_date | end_date | company_name | cin_number | main_business_activity | sector | name_of_product_or_service | risk_description | action_taken | note |
|---|---|---|---|---|---|---|---|---|---|
| 01-04-2025 | 31-03-2026 | Acc Limited | L26940GJ1936PLC149771 | Manufacturing | Industrials | PPC/OPC | Climate Change due to GHG emissions | Implemented Waste Heat Recovery Systems -Adopted use of alternative fuels/raw materials -Increase the renewable sources of energy -Zero-carbon heating technology -Decarbonise Supply Chains -use of Electric Vehicles -Clinker factor optimisation | |
| 01-04-2025 | 31-03-2026 | Adani Energy Solutions Limited | L40300GJ2013PLC077803 | Transmission Services | Utilities | Electricity from inhouse Solar installation under Life cycle perspective | Contamination due to landfilling of unrecyclable / unrecoverable material from end of life PV panels and Inverters and associated hardware/ components. | Eco-friendly designs, investment in advanced technology, takeback schemes, and employee education on proper handling, disposal and recycling. Secured landfilling for end of life PV panels is planned to avoid any contamination. Committed & certified for Zero Waste to Landfill, since 2022 | |
| 01-04-2025 | 31-03-2026 | Mahindra Logistics Limited | L63000MH2007PLC173466 | Transportation By Road | Land Transportation | Not available. MLL has not conducted LCA study for any of the services that it provides as part of its business. | Not available. MLL has not conducted LCA study for any of the services that it provides as part of its business. | Not available. MLL has not conducted LCA study for any of the services that it provides as part of its business. | |
| 01-04-2025 | 31-03-2026 | Capacit'E Infraprojects Limited | L45400MH2012PLC234318 | Civil Construction | Real Estate | Waste Generation | Waste management |
Securities and Exchange Board of India. BRSR_P2: Year-, Company- and Product/Service-wise Environmental and Social Risks and Actions Taken [Data set]. Dataful. https://dataful.in/datasets/19959
Reporting Principle (P2): Social or Environmental concerns and/or risks arising from production or disposal of the products / services, as identified in the Life Cycle Perspective The dataset contains year-, company-, and product/service-wise compiled data describing environmental and social risks arising from products and services, along with details of actions taken in each case, as reported by...
| Waste is segregated at source to facilitate effective recycling and safe disposal. Recyclable materials are maximized for reuse, while non-recyclable waste is managed and disposed of through authorized and environmentally compliant channels. |
| 01-04-2025 | 31-03-2026 | Kalpataru Projects International Limited | L40100GJ1981PLC004281 | Transmission and Distribution | Utilities | 400 kV Galvanised Steel Lattice Transmission Tower | Emissions and waste generation during galvanization and fabrication of transmission towers | Initiated LCA to identify hotspots, improve material efficiency, adopt energy transition measures, and strengthen circularity initiatives |
| 01-04-2025 | 31-03-2026 | Archean Chemical Industries Limited | L24298TN2009PLC072270 | Production of Marine Chemicals | Chemicals | Production of Bromine | Process Hazard Analysis (PHA): Risk of chemical release. | Process design controls, closed system operations, emergency response plan |
| 01-04-2025 | 31-03-2026 | Archean Chemical Industries Limited | L24298TN2009PLC072270 | Production of Marine Chemicals | Chemicals | Use of SO2 in Mother Liquor Preparation | Mechanical Integrity / Asset Integrity: SO2 release due to corrosion / equipment failure | Regular inspection, maintenance of scrubbers, integrity checks |
| 01-04-2025 | 31-03-2026 | Adani Energy Solutions Limited | L40300GJ2013PLC077803 | Transmission Services | Utilities | Transmission EPC projects under Life cycle perspective | Displacement during infrastructure development, community health and safety during project execution, | Stakeholder consultations, fair compensation and rehabilitation, stringent data privacy protocols, local employment generation, skill development programmes |
| 01-04-2025 | 31-03-2026 | Adani Energy Solutions Limited | L40300GJ2013PLC077803 | Transmission Services | Utilities | Smart metering system and cooling solutions systems under Life cycle perspective | Electronic waste from smart metering and cooling solutions, posing environmental risks that include the release of toxic substances, resource depletion, and greenhouse gas emissions. Challenges in e-waste handling by informal sectors | Best practices in waste management and recycling, Effective mitigation strategies involve recycling programs, eco-friendly designs, takeback schemes, and consumer education on proper disposal and recycling. Committed & certified for Zero Waste to Landfill, since 2022 |
| 01-04-2025 | 31-03-2026 | Adani Energy Solutions Limited | L40300GJ2013PLC077803 | Transmission Services | Utilities | Smart metering system under Life cycle perspective | Privacy and Cost concerns related to smart metering data with increases the vulnerability and the potential for cyber attacks | Stakeholder consultations, Smart meter standards IS:16444 and IS:15959, along with IEC:62056 series, define communication protocols and associated security. IEC:62443 and IEC 62351 standards define the compliances for cyber security for electrotechnical equipment and automation systems. Periodic security auditing, conformance testing of smart meters and devices, and cyber-security lifecycle testing are essential to maintain compliance. Training personnel are associated with critical infrastructure assets to enhance cyber security. Cyber-physical test beds were created to test individual devices in integrated environments. ISO/IEC 27001:2022 the international standard for Information Security Management Systems (ISMS) in place. |